Design
Engineering and Surface Facilities Document Update In The Existing Wellpad Area
Scope of Work
1. Identify the actual condition of equipment or supporting facilities in the field including future development needs.
2. Validate and evaluate the re-drawing results based on equipment changes/modifications and the creation of MOC document.
3. Update the drawing and engineering documents in exsisting Well PAD and brine areas at PLTP