Study

Performance Optimization Study of Cooling Tower

image

Scope Of Work

1. Collecting literature on the characteristics of the installed cooling tower
2. Conduct performance test for the installed cooling tower
3. Analyze performance test result
4. Conduct a study of changes in cooling water temperature after addition of one cell cooling tower
5. Provide recommendations regarding cooling tower performance