- View All
- Engineering Design
- Project Manajement Consultant
- Realibility, Risk & Integrity Assessment
- Special Case Study
- Stress Analysis, Simulation And Modelling

Over Protection ReDesign Service Pressure SAGS Units 3 & 4
engineering-design

Procuring Electrification Engineering Design Service PL-403 & PL-404
engineering-design

Relocation JL. MT. Haryono and JL. MH. Thamrin Central Java
engineering-design

Re-Front End Engineering Design Procurement Installation Well PPL-02
engineering-design

Provision of Pipeline Design Services
engineering-design

Consultancy Services for Front End Engineering Design (FEED) PLTP
engineering-design

Topography & Soil Investigation PAD 31
engineering-design

Study for Community – Based Clean Water Supply System Plan
engineering-design

Front End Engineering Design (FEED) Service for GPP Binary Cycle 10 MW
engineering-design

Front End Engineering Design (FEED) OPLL SLO Stage 2
engineering-design

FEED and DED of Civil Work for Rehabilitation in Wellpad and SAGS
engineering-design

Sump Pump Improvement Area 4 & 9 FOD
engineering-design

Front End Engineering Design (FEED) OPLL KotaBatak WK Rokan
engineering-design

Design Well Testing Line For Well ML-H1, ML-H5, ML-F2
engineering-design

PRV Structure Analysis Design
engineering-design

FEED Upgrade Flare Stack GS3 Minas WK Rokan
engineering-design

FEED Procurement and Replacement Gas Turbine Major Part
engineering-design

Pekerjaan Desain Pemipaan Sumur Geothermal
engineering-design

Jasa Konsultasi Instalasi Lift Power House
engineering-design

Engineering, Procurement & Construction (EPC) Work For Surface Facilities
engineering-design

Front End Engineering Design
engineering-design

Provision of FEED Consultant Services On Small Scale Geothermal Power Plant
project-manajement-consultant

PMC Hook Up Tie In PTH 07A & PTH 07B Unit 1
project-manajement-consultant

Consulting Services of Power House Lift Instalation in PLTP
project-manajement-consultant

Project Monitoring Consultant Penggantian Pipanisasi CB I Tasikmalaya Ujung Berung
project-manajement-consultant

Asset Integrity Risk Based Inspection and Energy Management System Assurance
reliability-risk-integrity-assessment

Quantitative Risk Assessment (QRA) Work for The Construction of Semipah
reliability-risk-integrity-assessment

Installation of KO Drum Flare Central Duri Gas Facility (CDGF) HCT
reliability-risk-integrity-assessment

Quantitative Risk Assessment Development of Detour Road Crossing in Crude Oil Pipelines
reliability-risk-integrity-assessment

Surface Assessment Service Work Facilities (SAGS)
reliability-risk-integrity-assessment

Risk Assessment for FEED Badik and West Badik Fields
reliability-risk-integrity-assessment

Floating Production Unit
special-case-study

Central and West Java Geothermal Field Audit Services
special-case-study

Mechanical Safety Protection WIP Phase 1 – Bangko EOR
special-case-study

Studi Konseptual Land Based LNG Terminal Cilacap
special-case-study

Performance Optimization Study of Cooling Tower
special-case-study

Audit Energy Lapangan Panas Bumi
special-case-study

Engineering Service Blanket Contract
stress-analysis-simulation-and-modelling